Project Update: CCS progresses garage equipment installation at Audi’s Tyne Tunnel workshop in North Shields

Details

Email Us

Work is underway and progressing well at Audi’s new workshop and body shop facility in North Shields, just outside Newcastle-upon-Tyne, as CCS manages the delivery of a complete garage equipment installation for our dealership client. CCS is appointed by our dealership client to manage the delivery of this new Paint and Body Centre in North Shields, Tyne & Wear, serving Audi customers across Newcastle-upon-Tyne and the North East from a self-contained facility at Tyne Tunnel Trading Estate. Located away from customer sales and dealership facilities, the dedicated workshop and body shop facilities at Tyne Tunnel enable our client to maximise opportunities from this spacious, bright and versatile building, creating a working space that’s fully-equipped to handle the complete vehicle range across the group, including Volkswagen, Audi, Skoda and Seat marques. The North Shields centre undertakes a wide range of work, in particular accident repair work, diagnostics analysis, and body work and paint repairs. An Audi specialist, the Luxury Structural Aluminium Approved facility is the only Audi R8 Aluminium Structural approved repairer in the North East, using genuine Audi parts and Audi specified paint that restore vehicles to their original condition. Learn more

Complete garage equipment installation to create a fully-equipped vehicle repair workshop for Audi in Tyne & Wear

The new facility at Tyne Tunnel consolidates our client’s existing workshops, creating a self-contained and fully-equipped workshop that has the capacity to grow with our client’s business in the coming years. Our workshop fit-out specification for this project included the relocation and reinstallation of our client’s existing garage equipment, including the safe installation of vehicle lifts, MOT bay and wheel alignment equipment relocated from previous workshops. By maximising value from our client’s existing assets, the workshop fit-out benefits from efficient budget control and ease of integration into our client’s workflow.

Our garage equipment installation specification for Audi’s Paint and Body Centre at Tyne Tunnel in North Shields includes:

  • Reinstallation of approximately 20 vehicle lifts, relocated from our client’s previous facilities
  • Supply and installation of 10 new Nussbaum Smart Lifts
  • Reinstallation of our client’s existing Class IV MOT bay
  • Supply and installation of 1 new Class IV MOT bay
  • 4 dedicated bays for EV vehicle lifts
  • Reinstallation of existing wheel alignment bay and wheel alignment equipment
  • Lubrication distribution system
  • LEV fume extraction system
  • Compressed air distribution system
  • Installation of extensive pipework systems
  • Full electrical installation by CCS’ dedicated in-house electrician
  • Installation of extensive 200mm concrete pads to reinforce workshop floor prior to installation of vehicle lifts

In-house electrical skills to support every garage equipment installation project

Our installation project for the Audi Paint and Body Centre in North Shields is supported by CCS’ dedicated, in-house electrical services. CCS is a complete workshop partner, and our scope of work extends far beyond pure garage equipment. Delivering turnkey projects that are ready to get to work, our specification often includes groundworks and civils to prepare sites for installation of equipment such as vehicle lifts, MOT bays, inspection pits and brake testers, installation of complex pipework systems for the efficient distribution of lubricants and compressed air, and electrical installation that ensures sufficient power safely reaches every part of the workshop. At Audi’s Tyne Tunnel site, our in-house electrician delivered the complex electrical installation to serve this large site and the equipment that is to follow. Electrics handled by CCS, on this project and across other large workshop sites, include:
  • Electrical installation throughout
  • Three-phase power supplies to all working areas and service bays
  • Wall lighting
  • Electrical heating
  • System testing and commission
Reliability is a key feature of a CCS workshop, and a safe, secure and professionally-designed electrical installation is central to delivery of a garage equipment project that keeps our client businesses up and running around the clock. 4 brand new Nussbaum Smart Lifts installed by CCS Garage Equipment. A suite of 4, brand new Nussbaum Smart Lifts adds further lifting capacity to this spacious workshop facility. Smart Lifts by Nussbaum, and installed by CCS across the UK and Ireland, are versatile and easy to use, with unmatched safety features that make these lifts a workshop essential for businesses worldwide.  Fully-equipped service bays featuring lubrication hoses and reels, three-phase power and compressed air. Each fully-equipped service bay within the workshop is serviced by lubrication hoses and reels, three-phase power and compressed air to ensure technicians have access to all the equipment they need, when they need it. With over 30 years’ experience, CCS Garage Equipment understands the demands of modern workshop operations, designing every element from the ground up to support efficient and safe working.

Contact CCS to discuss your dealership’s garage equipment installation project

Request a quote